You are here: Nustar Wiki>EXL Web>WorkPlan (revision 5)EditAttach

2012 Work Plans for E105 experiment at the ESR

  • WP_DAQ.pdf: Work plan for the DAQ and FEE slow-control

Topic attachments
I Attachment Action SizeSorted ascending Date Who Comment
Working_package_cabling.docxdocx Working_package_cabling.docx manage 13.4 K 16 Feb 2012 - 10:13 OlegKiselev WP Cabling and feedthroughs
WP_beam-daignostics.pdfpdf WP_beam-daignostics.pdf manage 16.9 K 22 Feb 2012 - 12:52 MirkoVonSchmid Work plan for the luminosity monitor
WP_pocket-detector.pdfpdf WP_pocket-detector.pdf manage 17.8 K 22 Feb 2012 - 12:53 MirkoVonSchmid Work plan for the downstream pocket-detector ("munich detector")
WP_target-slit.pdfpdf WP_target-slit.pdf manage 20.3 K 22 Feb 2012 - 12:54 MirkoVonSchmid Work plan for the aperture in front of the gas-jet target
WP_DAQ.pdfpdf WP_DAQ.pdf manage 22.0 K 22 Feb 2012 - 12:52 MirkoVonSchmid Work plan for the DAQ and FEE slow-control
WPlan_DSSD_SiLi.pdfpdf WPlan_DSSD_SiLi.pdf manage 43.5 K 14 Mar 2012 - 18:15 BranislavS Work Plan for the DSSD's and SiLi's
Vacuum_WP.pdfpdf Vacuum_WP.pdf manage 52.5 K 15 Feb 2012 - 09:11 BranislavS Work Plan for the vacuum system
TopicsforpreparationoftheEXLexperiment.docdoc TopicsforpreparationoftheEXLexperiment.doc manage 55.5 K 16 Feb 2012 - 09:23 CatherineRigollet Task list for preparation of EXL experiments
Topic revision: r5 - 14 Mar 2012, BranislavS
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Nustar Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)